Concrete Floor Prep For Vinyl Plank Flooring
This is the second time we ve done our concrete basement using vinyl plank flooring see the last place here.
Concrete floor prep for vinyl plank flooring. If a floor plank and underlayment or adhesive will not fit under the door casing cut the casing with a backsaw about 1 16 inch above the level of the new flooring. To install vinyl plank flooring on concrete you ll first need to clean the concrete with soap and water and fill in any cracks with concrete filler. Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company. Don t sand vinyl flooring as it may contain asbestos.
Prep your subfloor so that it s clean dry and level within 3 16 inch change per 10 feet. It can be constructed from wood plywood plastic or concrete. And this time it went so much smoother. Before installing your vinyl flooring whether the subfloor of your work area is hardwood or concrete one crucial step is to make sure the subfloor is level and clean.
Vinyl planks are a great option if you want durable flooring but don t have a ton of installation experience. Use a self leveler on low spots and or sand high spots of wood or concrete. Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight. Preparing a concrete subfloor for luxury vinyl flooring concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins. If a floor plank and underlayment or adhesive will not fit under the door remove the door and trim it with a circular saw about 1 8 inch above the level of the new flooring. Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing. I did this whole room by myself completely in two evenings and about half an hour the next day and feel confident that these tips and tools will help you if you want to do the same.
However laying vinyl flooring over concrete requires a bit more preparation. A subfloor is the bottom layer of any floor. Leave the vinyl in place for 72 hours. Test the floor for moisture.